The Chicago Great Western was best known for running F units in A-B-B-B-B-A sets of six. Here's a photo I found on the web with six units in full as-delivered paint:
The F3s were delivered in October 1947 in A-B-A sets. A photo of such a set is below: The CGW didn't order more B units to fill out the consists until 1949, so that an A-B-A set is definitely correct for the first two years of operation, but A-B-A sets were still used in some situations after six unit consists became the norm. By that time, the extra B units arrived in the later F unit body style with horizontal side vents similar to the F7, so that a consist of six matched F3 units would be unusual.Unfortunately, Broadway Limited doesn't offer either separate B units or powered B units, but a later-year consist can be filled out with Stewart or Bowser F units in the all-maroon scheme.